Electrolux EXI09HD1WI Manual do Utilizador Página 22

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 136
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 21
22
When Using the Vacuum Pump
Gas Leakage Check
Test and Running
Electrical Safety Check
1 &RPSOHWHO\WLJKWHQWKHÀDUHQXWVRQ$%&
and D, connect the manifold valve charge
hose (blue) to the charge port of the low
pressure valve (3-way valve) on the gas pipe
side.
2 Connect the other charge hose (yellow) of
manifold to the vacuum pump.
3 Fully open the handle Lo of the manifold
valve.
4 Open the vacuum pump for vacuumization.
$WWKHEHJLQQLQJVOLJKWO\ORRVHWKHÀDUHQXW
of the low pressure valve to check if there
is air coming inside (If operation noise of
the vacuum pump has been changed, the
reading of multimeter is 0 instead of minus).
7KHQWLJKWHQWKHÀDUHQXW
5 Keep vacuuming for more than 15 minutes
and make sure the reading of multimeter is
[
5
Pa (-76cmHg). Then fully close
the handle Lo of manifold valve and stop the
operation of the vacuum pump.
6 Turn the stem of the stop valve B (2-way
valve) about 45° counterclockwise for 6~7
seconds after the gas coming out, then
WLJKWHQWKHÀDUHQXWDJDLQ0DNHVXUHWKH
pressure display in the pressure indicator is a
little higher than the atmosphere pressure.
7 Remove the charge hose from the low
pressure charge port.
8 Fully open the valve stems of A (3-way valve)
and B (2-way valve).
9 Securely tighten the stem cap.
1 Soap water method:
Apply soap water or liquid neutral detergent on
all valves and pipe connections (A, B, C and D,
UHIHUWRWKH¿JXUHEHORZLQYROYHGLQLQVWDOODWLRQ
by a soft brush to check for leakage.
If bubbles come out, the pipes have leakage.
2 Leak detector
Use the leak detector to check for leakage.
Perform the electric safe check after completing the
installation:
1 Earthing work
$IWHU¿QLVKLQJHDUWKLQJZRUNPHDVXUHWKH
earthing resistance by visual detection and
earthing resistance tester.
2 Electrical leakage check
(performing during test running)
'XULQJWHVWRSHUDWLRQDIWHU¿QLVKLQJLQVWDOODWLRQ
the service person can use the electric probe
and multimeter to perform the electrical leakage
check. Turn off the unit immediately if refrigerant
OHDNDJHKDSSHQV&KHFNDQG¿QGRXWWKH
solution ways till the unit operate properly.
Outdoor Unit
Manifold
valve
Multimeter
-76cmHg
Lo Handle
Hi Handle
Charging hose
Low pressure
valve
Charging
hose
Vacuum Pump
Indoor unit
check points
Liquid pipe
Gas pipe
Outdoor
Unit
Outdoor unit
check points
2-way
valve
3-way
valve
B
D
C
A
Vista de página 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 135 136

Comentários a estes Manuais

Sem comentários